Scope Of Work
project name: construction of three roads in beledweyne east and
west (loop 1 – beledweyne east, 2-beledweyne west-huriwa road, and 3-
beledweyne west-sheikh hassan barsane)
The project is situated in Beledweyne, Hirshabelle State, Somalia. The three loops commence at
the banks of the Shabelle River, with Loop1 lying to the east and Loops 2 & 3 to the west.
The area is predominantly flat topography and is characterized by sandy soils of relatively high bearing
capacity. The River occasionally breaks its banks during the rainy seasons which occur during the two
main seasons of Deyr & Gu’ rains.